Construction of Windspeaker Radio Studios - Calgary
- Demolition 2
- Future 88.1 Control Room Studio
- Future 88.1 Production Studio
- Future Jock area
- Demolition!!
- Demolition 3
- Old carpet ripped out
- Old rug GONE!
- Contractor Roland doing some ceiling work
- Office construction
- floor shot - Calgary Studios
- View outside future studio windows
- Insulation time!
- Office’s
- Future Production & Control Room
- Reception area
- Walls are up!
- A shot inside future Control Room
- Preparing to paint the office walls
- Fresh paint - outside of the studio's
- Main Area
- Main area
- Reception
- Ready for some carpets
- Control Room
- Carpets laid
- Equipment & Desks starting to arrive
- Control Room
- New Studio
- Control Room Board
- Production room
- Control Room
- Jock Lounge
- Reception Lobby
- Jock Lounge
- Studio
- Outside of the Studio
- Production Room
- Boardroom
- Ribbon Cutting